Artemis III: NASA Details Two Docking Tests for the 2027 Orbital Rehearsal
NASA named the Artemis III crew and confirmed the 2027 mission as a low Earth orbit rendezvous and docking test for the commercial landers and spacesuit systems
November 8, 2026 update Two docking partners, two different control handoffs NASA's current Artemis III mission page still lists a 2027 launch, four crew members and a demonstration in low Earth orbit. A newly published engineering interview gives that broad mission description a more useful test checklist. In episode 443 of Houston We Have a Podcast, NASA Human Landing System engineers Kent Criswell and Reid Ruggles describe how Orion would approach, dock with and operate alongside two different commercial test vehicles. The interview was recorded August 10, 2026, so its publication is not evidence that hardware has since completed certification. Blue Origin's development vehicle is called Mark 2-D. Criswell says it would use essentially the lunar lander's crew module, with supporting structure for radiators, solar panels and thrusters, but without the BE-7 lunar landing engine. Orion would be the approaching spacecraft and supply the active side of the docking interface. After contact, Orion would control the joined vehicles. A planned crew entry into Blue's module would test environmental control and life-support functions as well as the physical passage between spacecraft. The SpaceX arrangement reverses the control responsibility. Its test article would be a derivative of the V3 Starship upper stage, and Starship would control the docked combination. That means Artemis III is not one docking exercise repeated against a different target. The flight must establish two sets of software behavior, communications, vehicle responses and operational procedures. A compatible docking ring is only one part of that job. What to measure before calling the rehearsal a success The engineers describe target acquisition, proximity operations and thruster interactions as real integration problems. Orion's sensors must recognize an actual spacecraft under orbital lighting, rather than an idealized target. Thruster exhaust can disturb the other vehicle during approach. After docking, the combined structure must maintain a workable attitude for power generation and heat rejection. Earth orbit also adds reflected sunlight and repeated light-to-shadow transitions that do not duplicate a lunar mission's thermal conditions. Approach and contact: verify sensors, communications and docking mechanisms together. Joined flight: demonstrate the correct control handoff for each spacecraft pair. Crew operations: test access, procedures and the planned Blue crew-module checks. Launch coordination: integrate commercial test-vehicle launches with the SLS and Orion crew flight. A docking result is not a lunar landing result The limits matter as much as the objectives. Ruggles distinguishes the Earth-orbit demonstration from the long-duration operations and orbital propellant-transfer work needed for lunar missions. A successful Artemis III would not demonstrate touchdown among rocks and slopes, engine-plume interaction with lunar soil or ascent from the surface. Uncrewed lunar demonstrations remain separate evidence. Readers should track those milestones independently rather than treating a successful docking as proof that every part of a landing architecture is ready. The practical change since this article's August refresh is a clearer definition of the interfaces NASA intends to test, not a new confirmed launch day. The mission page retains 2027 as its launch year. The interview helps distinguish measurable flight objectives from the remaining work required for later lunar landings. Sources checked November 8: NASA Artemis III mission page ; NASA engineering interview, episode 443 . Mission descriptions are NASA's plans, not completed flight results. Earlier reporting and background On April 27 and 28, 2026, two pieces of NASA's future arrived at Kennedy Space Center within hours of each other. The SLS core stage for Artemis III docked at the turn basin wharf after a 900-mile barge journey from New Orleans. The next morning, the Orion capsule that carried Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen around the Moon rolled through the gates after a cross-country truck convoy from San Diego. The timing was striking but not coincidental. It captured exactly where NASA's moon program sits right now: one mission just closed, the next already moving. What almost no one agrees on is what that next mission actually is. The Artemis III SLS core stage arrives at KSC's turn basin wharf, April 27, 2026. Credit: AI-generated / Cislunar News June 9, 2026 update NASA Named the Artemis III Crew NASA has now turned Artemis III from a revised mission design into a named flight. The agency assigned Randy Bresnik as commander, Luca Parmitano of ESA as pilot, and NASA astronauts Andre Douglas and Frank Rubio as mission specialists. NASA also named Bob Hines as backup crew member. The assignment confirms the shape of the mission. Artemis III is targeted for 2027 as a low Earth orbit rendezvous and docking test, not a lunar landing. Orion will launch on SLS, complete systems checkouts, and dock with test versions of commercial human landing systems from Blue Origin and SpaceX. NASA says the crew is expected to spend about two weeks in space, with roughly two days docked to Blue Origin's lander pathfinder and about one day connected to SpaceX's Starship pathfinder if the planned sequence holds. Randy Bresnik Commander, NASA, third spaceflight Luca Parmitano Pilot, ESA, first ESA astronaut assigned to Artemis Andre Douglas Mission specialist, NASA Frank Rubio Mission specialist, NASA, record long-duration flyer The new crew also sharpens the training problem. NASA says the astronauts will begin work immediately on Orion systems while helping Blue Origin and SpaceX mature lander test articles, docking interfaces, software, communications, and crew procedures. Engineers are due to connect the Orion crew module and service module this summer, integrate Orion's docking system for its first flight, install heat shield blocks after ultrasonic inspections, and start SLS stacking this summer once core stage engine-section work and mobile launcher refurbishment are ready. The most important change is political as much as technical. Artemis III now has faces, roles, and a mission clock. It still does not have a lunar landing. NASA is using the flight to retire the risk that sits between Orion and the private landers before Artemis IV attempts the south pole in 2028. Sources: NASA June 9 crew announcement , NASA event notice , and NASA Artemis III mission page . Not What It Used to Be For years, Artemis III was the mission on every press release: the first crewed lunar landing since Apollo 17, the mission that would put boots on the Moon's south pole for the first time in history. NASA built the entire architecture around it. The spacesuits, the Human Landing System contracts, the Gateway debates, the launch manifest -- all of it pointed at Artemis III as the payoff moment. That version of the mission no longer exists. On February 27, 2026, NASA Administrator Jared Isaacman announced a sweeping restructure. Artemis III became a low Earth orbit demonstration mission , targeting no earlier than late 2027. The lunar landing moved to Artemis IV, targeted for 2028. The reason, as NASA framed it: reduce risk by testing the hardware and procedures closer to home before trusting them 239,000 miles away. The comparison Isaacman and NASA officials reached for repeatedly was Apollo 9. In March 1969, NASA flew the first crewed Lunar Module test in Earth orbit before Apollo 10 went to the Moon and Apollo 11 landed. The agency needed to prove the lander worked before betting lives on it at another world. Artemis III is being positioned as the same kind of proof flight, just with commercial landers instead of a government-built one. Artemis III: The New Profile Orion carries a crew of four to low Earth orbit on SLS. The spacecraft rendezvous and docks with one or both commercial Human Landing Systems (SpaceX